Engineer Training at the Tower

I was tired after being up so late last night, but I got to the fire station at ten this morning to work with Gribbon on his evolutions. We did several different lays, including a dwelling lay, standpipe, crosslay, and a street pipe. He did a good job. We were running later than I wanted … Continue reading Engineer Training at the Tower